A test run of Metro Rail is carried out inside Uttara’s depot area in Dhaka, Bangladesh on May 11, 2021. As a part of performance test of the first set of metro trains imported from Japan. The consortium started manufacturing the rolling stock in April 2019 under a Tk 28.70 billion deal signed in 2017
A test run of Metro Rail is carried out inside Uttara’s depot area in Dhaka, Bangladesh on May 11, 2021. As a part of performance test of the first set of metro trains imported from Japan. The consortium started manufacturing the rolling stock in April 2019 under a Tk 28.70 billion deal signed in 2017